contents

business
 
editorial
news
press room
press service
information
trade fairs
classifieds
useful links

ABB to automate generation at iconic Aswan hydropower plants

ABB, the leading power and automation technology group, will upgrade the automation of the Aswan hydropower plants, making the power generation more reliable and efficient. The order was booked in the third quarter.

The order is worth over $20 million and was awarded by the Hydro Plants Generation Company (HPGC) to provide extensive plant automation and control solutions for the Aswan hydropower complex in Egypt as part of a major plant rehabilitation program.

The hydropower complex which is located at the Aswan dam, is the largest in Africa and the third-largest in the world by water reservoir volume. Located some 900 kilometers south of the capital, Cairo, the plants were built between 1960 and 1986 to harness the flood waters of the river Nile for irrigation and power generation purposes.

The complex comprises three hydropower plants with a generation capacity of more than 2,600 megawatt and provides 10 percent of Egypt's power generation capacity.

As part of the turnkey project, ABB will supply a new integrated plant automation solution including the latest Symphony Plus technology, instrumentation, transformer and generator protection systems, turbine governor systems and electro-hydraulic equipment at one of the plants. ABB will also upgrade selected control and excitation systems, automatic voltage regulators, turbine governor systems and electro-hydraulic equipment.

The electrical protection systems for the 132 kilovolt substation that connects the power generated at the plant to the transmission grid will also be upgraded. ABB is responsible for engineering, supply, installation, and commissioning.



write your comments about the article :: © 2011 Construction News :: home page