contents

technologies
 
editorial
news
press room
press service
information
trade fairs
classifieds
useful links

Sennebogen 608 with crawler track at the bridge in Dresden

Hentschke Bau used a Sennebogen 608 with crawler track for the Waldschlösschen Bridge traffic course (Planning section 2). The construction project includes the realisation of entry and exit points through several tunnel and ramp structures on the Waldschlösschen Bridge in Dresden crossing the river Elbe. With its crawler track, 20 m telescopic boom length and compact construction, the 608 was able to cover a large working area without moving the machine. The movement - including under load - and the mobility in difficult ground conditions, were praised by the drivers, along with the elevating and tilting cab which is unique in this class. The flexibility afforded by the hydraulic quick change system makes the 608 crawler a real all-round machine. In addition to the winches, various different attachments can be mounted quickly and easily, such as a 360° rotating work platform, lifting forks or a shovel.



write your comments about the article :: © 2011 Construction News :: home page