contents

business
 
editorial
news
press room
press service
information
trade fairs
classifieds
useful links

ABB wins power transmission order in China

Swiss engineering group ABB has won an order worth about $120 million to engineer and supply key equipment for the Jinping-Sunan 800 kilovolt (kV) Ultra High Voltage Direct Current (UHVDC) power transmission project of the State Grid Corporation of China (SGCC).

The system and key equipment will be designed in close cooperation with SGCC and local Chinese partners, and ABB will also supply key components for both converter stations, including converter valves, the control and protection system and DC yard equipment. As separately announced, ABB has also been selected to supply the 800 kilovolt (kV) UHVDC transformers for both converter stations.

The 2,090 km power link will transport clean hydropower from Sichuan province in central-western China to the highly industrialized coastal area in the eastern province of Jiangsu. The UHVDC link will have a rated capacity of 7,200 megawatts (MW), and is expected to be energized in 2013.



write your comments about the article :: © 2011 Construction News :: home page