contents

business
 
editorial
news
press room
press service
information
trade fairs
classifieds
useful links

Besix signs contract for a wastewater plant in Abu Dhabi

Egypt's Orascom Construction Industries (OCI) confirmed that Besix (50% owned by OCI) has been awarded in joint venture with Veolia Water, a BOOT contract (Build, Own, Operate, and Transfer) to finance, construct and operate two new wastewater treatment plants for the city of Abu Dhabi and Al Ain in the UAE.

The contract has been signed with the Abu Dhabi Water and Electricity Authority (ADWEA) for a period of 25 years of which 2.5 years will be required for the construction of the Abu Dhabi and the Al Ain plants. Besix will participate (33%) in the operation and maintenance of the plants, for a period of 22.5 years. The consolidated contract value is EUR 525 million of which Besix has a 50% share.

This project is the second BOOT contract for Besix succeeding the concession signed with the Emirate of Ajman in February 2006 valued at EUR 429 million.



write your comments about the article :: © 2008 Construction News :: home page