contents

business
 
editorial
news
press room
press service
information
trade fairs
classifieds
useful links

Iberdrola Ingeniería to build solar photovoltaic plant in Cáceres

Iberdrola Ingeniería y Construcción has won contracts for the second of two phases of a 20 MW solar photovoltaic plant in the Spanish province of Cáceres. The installation, on a 178-hectare site, could be in operation as early as September of this year.

The project, called Abertura FV, was awarded by Aliwin Plus to the engineering unit of Spain's Iberdrola utility group, has also begun work on the first phase, a 10 MW installation on ad area of almost 100 hectares.

The second phase, for another 10 MW via 100 panels producing 114.7 peak kilowatts (kWp) each, on an area of some 80 hectares.



write your comments about the article :: © 2008 Construction News :: home page