contents

business
 
editorial
news
press room
press service
information
trade fairs
classifieds
useful links

Fluor to build offshore platform for BG Trinidad & Tobago

Fluor Corporation announced that its subsidiary, Fluor Daniel South America Limited, will lead a consortium with J. Ray McDermott, a subsidiary of McDermott International, Inc., to provide program management, engineering, procurement, construction and installation (EPCI) of the 4,000-ton topsides for an offshore drilling and gas production platform for BG Trinidad & Tobago Limited. The Poinsettia project will be located off the northwest coast of Trinidad in 530 feet of water.

TOFCO of Trinidad, a key subcontractor on the project, will be fabricating the topsides at its fabrication yard in Trinidad. It is the first time that topsides of this size will be fabricated in Trinidad by a local fabricator.

Fluor's project scope includes overall project management as well as the design and fabrication of the platform topsides by TOFCO and J.Ray McDermott's scope is the design and fabrication of the platform jacket, as well as transportation and installation of both the jacket and the topsides. Fluor will also provide the final hook-up and commissioning assistance.

Project construction is slated to begin in fall 2007, with fourth quarter 2008 mechanical completion and first gas at the end of 2008.



write your comments about the article :: © 2007 Construction News :: home page