contents

business
 
editorial
news
press room
press service
information
trade fairs
classifieds
useful links

Systra wins contract for Bagdad Metro

During the visit of a delegation from the Bagdad Mayoralty in Paris, the Mayoralty of Bagdad and French design consultant Systra have signed the contract for the Design and Tender Services of the Bagdad Underground Metro Lines 1 and 2.

The project consists in the basic design, preparation of tender documents, and selection of EPC Contractor for two underground metro lines. Line 1 will be approximately 22 km long and Line 2 will be approximately 18 km long. There will be an average of one station per kilometre.

The underground metro project will be the backbone of future transport development in the Iraqi capital. The provision of an underground metro system will address growing transport needs and improve the worldwide perception of the city.



write your comments about the article :: © 2011 Construction News :: home page