contents

business
 
editorial
news
press room
press service
information
trade fairs
classifieds
useful links

Dutch Boskalis gets contracts linked to Nord Stream

Boskalis Westminster, the world's largest dredging company, has acquired three oil- and gas-related contracts for projects in Europe and the Middle East. The total contract value amounts to approximately € 100 million.

Two contracts are linked to the "Nord Stream" project. This project encompasses the construction of two 1,220-kilometer gas pipelines from Russia to Northern Germany through the Baltic Sea. Boskalis will prepare the seabed for the laying of the pipelines over the full distance of the Nord Stream pipelines, and also execute the shore approach of the pipelines in Germany.

The contract for the preparation of the seabed for the 1,220-kilometer double pipeline requires the construction of rock beds and berms using approximately 320,000 tonnes of rock to level and stabilize the seabed. The project will be executed in a 50/50 partnership with Tideway and be realized in 2010.

The contract for the shore approach for the double pipeline in Germany requires the dredging of a 23-kilometer trench for the pipes, a pipe-pull over a distance of approximately 800 meters and the backfilling of the dredged trench. A 650-meter cofferdam will be constructed on the waterline to protect the pipeline. The project will be executed in a 50/50 partnership with Rohde Nielsen A/S and will also be realized in 2010.

The third contract comprises the infrastructure, including the shore approach, for an oil pipeline from the Safaniyah offshore field to the mainland of Saudi Arabia. Boskalis will dredge a 7-kilometer trench and backfill the trench with sand after completing a pipe-pull. The project will be executed in 2009 for Saudi Aramco.



write your comments about the article :: © 2009 Construction News :: home page